Even before the technical installations on the Blankenburg connection were physically installed, the software for controlling them had already been tested and purchased by construction consortium BAAK. This is the result of meticulous preparation.
ICT Group developed the software in collaboration with BAAK and other BAAK contractors, tested it and integrated it with the 3B layer (coordinating control) above. All this has now been delivered and taken delivery of by the construction consortium. Soon the last pack of the final version of the software will also be delivered and ICT Group will support the commissioning of the Holland Tunnel and later the Maas Delta Tunnel.